Saturday, June 12, 2010

Gold Rush Leg Parts and Brackets

I got to work on Gold Rush and completely replaced all the stock bioloid brackets used for the legs. All parts were machined from 0.06 inch thick aluminum sheet on a manual vertical mill, bent with a metal brake and media blasted.

Servo horn, servo body brackets and femur cross supports.

Coxa and Femur leg segments assembled.

Servo body brackets to foot mounts assembled.

Servo body brackets and foot mounts attached to leg.

Wooden dowel feet added and legs fully assembled.